On January 9, 2025, a crane lowered the final cross-laminated timber (CLT) roof panel into place. Today BC Housing released a 30-second video to recognize the milestone.
January 23, 2025
On January 9, 2025, a crane lowered the final cross-laminated timber (CLT) roof panel into place. Today BC Housing released a 30-second video to recognize the milestone.
As we roll into the cooler weather, the Vienna House site is teeming with activity. Two of the building’s six floors are now in place and the third is well underway.